Viewing post #1176039 by microb

You are viewing a single post made by microb in the thread called New Epi Greenhouse 2016.
Image
Jun 8, 2016 10:34 AM CST
Name: Mike
Mountain View, Hawaii
Region: Hawaii Region: United Kingdom
Terri, I zip tie 2 x 3 lumber to the vertical frame (four on each side) and then nail horizontal 2 x 3 lumber along the sides. I don't need to take the plastic all the way to the ground. When the plastic comes down the side I wrap it around lengths of 1 x 2 inch lumber and then nail it to the 2 x 3. Hope that makes sense.
I"ll try and post pics as construction takes place.

« Return to the thread "New Epi Greenhouse 2016"
« Return to Epiphyllums forum
« Return to the Garden.org homepage

Member Login:

( No account? Join now! )

Today's site banner is by Lucius93 and is called "Gerbera"

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.