Cement needs moisture to cure properly. It takes 28 days for cement to reach it's best strength for use. And like Lynn said, it leaches out the lime. Some people skip the 28 day cure but I've always done it because in my freeze/thaw climate I want them to be as strong as possible.
Curing should also be done at a minimum of 50 deg. F.