Hi Empress
Thank you ! Yes, did the work by myself. The foundation is slag sand both under the bricks (6" bed, tamped down) and swept between the bricks when the job is finished.
Also, while my terrain is level, I did lay the walkway up and over a mound of dirt covering a drain tile. It worked great.
"Things won are done, joy's soul lies in the doing." Shakespeare