I'm glad that everything is due to arrive at Mike's sorting house.
I spent the day building 2 4'X20' raised beds with pine logs and hay lined walk paths between. It's a good spot and I think I can get 4 more between those and the driveway. Beds are 1/2 full of walkway dirt and used goat bedding. I'll add 3 inches of mushroom compost and some wood ashes this week. 1 of those beds is getting the strawberries as,soon as they get here.