This is what was accomplished yesterday. The eaves were cut back on both sides as well as the gutters. Support 2x4's were placed on the long, left side. Some of the roof will be cut back the same depth as the eaves when the Florian aluminum support structure is ready to begin. How much roof is removed depends on the slope of the glass roof. The roof was left intact so that rain won't get into the house. Some more concrete was ground off to further level the entrances at the French doors in preparation of tile being laid.
The concrete finishers are supposed to come today with industrial concrete grinders to get a better taper leading to the drain. They were supposed to have done that yesterday, so I'll see if they show.